Oregon State University / COAS / WECOMA / Other Deck Equipment

Other Deck Equipment

Quick Index:
Hydro A frame - Stern A frame - Air Tuggers - Rosette/CTD Rail - Hydro Platform - Capstan - Work Boats - Bulwarks - Working Side

Hydro A-frame (Hydraulic)

Stern Hydraulic A-Frame (New in 1994)

Air Tuggers

Rosette/CTD Rail

Extends by means of a hydraulic ram a total distance of 6' from inside the wet lab through a 6' wide by 8' high double watertight door, to a point 3'6" outside of the door. The rail is fitted with a push-type trolley and a 1,000 lb capacity air hoist.

Hydro Platform (Available on request only)

Extends over the side at Main Deck, under and forward of the hydro A-frame. Dimensions are 36" x 38.5"

Capstan (portable)

Work Boats

Bulwarks

Fantail bulwarks are bolted in place and sections can be removed for moving equipment over the side or stern.

Working Side

The Starboard side of the ship is the working side
Return to Wecoma Home Page

Contacts:
Tim Holt, holtt@oce.orst.edu, MT Skunk Works